Thiking about selling my shell DUF 588
6 Sept 2009how much we talking though to have a car built within the 8wk period with carbon tubs etc. 20k and beyond or not scratching the surface yet.
Built around the cars. Kept alive by the people.

Archived member · original account, not a current login
how much we talking though to have a car built within the 8wk period with carbon tubs etc. 20k and beyond or not scratching the surface yet.
0 members and 1 guest active in the last 15 minutes
Visitors Today6
33,602 threads, 484,230 posts and 24,897 images saved from CalaisTurbo.
As at . Recovery is continuing.